- Guide for the implementation of post-COVID-19 preventative measures in the construction sector, for works of less than 400 metres squared.
- Health reference protocol for engineering and architecture offices before the COVID-19
- Reactivation and Continuity of Sectors during the State of National Emergency by COVID-19 – MINISTRY OF HOUSING AND HUMAN ASSEMBLIES
- 2020 – GC Manifesto Urgent need for infrastructure works

Categories